70% of structural pieces were delivered to IaaC from Finnforest / Merk, Germany. All pieces are unloaded to IaaC space and ready to be assembled.

70% of structural pieces were delivered to IaaC from Finnforest / Merk, Germany. All pieces are unloaded to IaaC space and ready to be assembled.